No source assignment found for cost element u00936500100u0094

Dear all

when I make the production order,the error message "Messages were issued when costs were calculated"

Diagnosis

The sender bears the ZB source structure and was debited with costs from the 6500100 cost element. This cost element is not assigned to any source assignment in the YHGP controlling area of the YHGP source source structure.

Procedure

Maintain the ZB source structure.

1.message let me "Maintain the ZB source structure",but in OKEU ,I have maintained the source structure correctly.

2.when I put the material which Valuation Class is "PK01" in this work center ,the error will happen ,however put this material to another work center ,it will never any error.

Any one can help me

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Aug 09, 2007 at 08:57 AM

    cancel

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 23, 2008 at 07:44 AM

    hi

    can u tell me what solution you got....i also getting the error...

    revert

    regards

    Pran

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.