Reprocessing process with production entries

Aug 09, 2017 at 08:21 AM


avatar image


Please check the below scenario

Produced some items and we cannot use the same due to quality issues . we need to reprocess it (let’s say tempering process is not ok so we need to retemper it ). Currently we don’t use any system to record it .

How can we show the reprocessing in system to capture cost but should show as production .

We need to get the details of manpower utilized for reprocessing much breakage happening during reprocessing there any standard program for the same?

Many thanks,


10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

Darrell Hart Aug 09, 2017 at 10:53 PM

My suggestion would be to create a work centre called "Rework" or similar with the same activity types as a standard manufacturing work centre.

When there is reprocessing to be done, add an operation to the Production Order using this work centre and code the time to it.

The costs are captured within the Production Order and you can report on the qty of Reprocessing using std Production reports.

Hope this helps


10 |10000 characters needed characters left characters exceeded
Srini Nampelly Aug 11, 2017 at 03:27 PM

Here is the rework process when you use services(labor/Machine) but not creating a new item -

Create an Rework order – CORO (COR7 – for Production Orders)
Assign the standard/parent order
Assign the components that you are using for rework
Confirm the order – CORK/ CO15

Show 2 Share
10 |10000 characters needed characters left characters exceeded

Hi srini

currently we are creating PO through CO01, will it work in this case?


Yes, It should work.. You can create a scenario in Test system and show this to Costing guy to check if the order is settled correctly or not.