cancel
Showing results for 
Search instead for 
Did you mean: 

Problem in transaction SWWL.

Former Member
0 Kudos

Hello Experts,

I have a BPM which has two parts like -

Send TaxConditions & send freight charges.

These two inputs are differentiated using field KSCHL correlation is maintained using the same field.

The BPM is working fine for Taxconditions , they are posted succesfully on target side.

I am facing problem for freight charges.

A old process which once reached till the process completed status, has blocked the way for other following messages.

In sxmb_moni on outbound side i get the status as green flag. On clicking on to PE link in the message i get the massage as

" Message XXXXXXXXXXX held at process YYYYYYYYYYY but not yet processed"

On clicking ok, another popup is displayed with title "WDTTREE" & message

can not use node of type Leaf as parent

Last Error node key : ZZZZZZZZ

On checking ZZZZZZZZ in SXMB_MONI_BPE : it displays a task with type background & text " Trigers a process alert in background" .

I tried to delete it using SWWL , found that there is not a single entry in transaction SWWL. Tried removing all the criterias, but failed to find any entry in SWWL.

Please help me into this. Suggest me if there is any other way to clear off this process so that further messages are processed.

Thanks in advance,

Abhijeet.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

in the selection screen have a look at second selection criteria "type" which will

be possibly filled by default. If you are searching for single tasks in SWWL and this type is filled with wrong entry your search will fail.

Same for time and date entries I think:

time selection is valid for all days, so if you start with

time 09:00 to 22:00 you wille exclude 22:01 to 08:59 for all days in the selection area for days.

regards

Dirk

Former Member
0 Kudos

Hello Frnds,

Thanks for sugestions but i have tried with all the criteria's , but no use. I have the Work item id of the error'd work item , which has blocked the way for others - it is not available in SWWL but is available in SXMB_MONI_BPE.

Some time back I have deleted all the work items with status error or In process for long time - during this particular period.May be during this, required workitem is deleted from SWWL but , in that case it should have been cleared off completely from system. It can be still viewed through SXMB_MONI_BPE.

Is it possible to completely remove/delete this work item using some other transaction / fm / program other than SWWL, since it has been removed now from SWWL?

Answers (1)

Answers (1)

Former Member
0 Kudos

Please provide the correct date in the filter condition. The filter condition you might have ignored.

Please reward points if useful

Thanks

Arghadip