Hello SAP Experts,

Did you have an issue with STO Return (UB-NL-WIA)? I am trying to set up a flow where:

- Supplying plant is always "123" registered in PL and DE

- STO is done between OU10 (PL) and EX10 (DE) and back

Do we have any chance to customize under SAP Standard flow back ? DE->PL?

I have tried with Dlv type ZRL (as a copy od RL - with ZDL order type) but i was not able to go through routine 08 in Plant Abroad pricing procedure.

Is it possible also to use the same tax codes (tax reporting country?) for those two flows?

Accepted Solutions (0)

Answers (1)

Answers (1)

Lakshmipathi
Active Contributor
0 Kudos

Not sure, whether you have gone through OSS note 1829647 already

Former Member
0 Kudos

Hello,

Yes, i went through this OSS - it is not directly connected to my issue. In our case we have just one supplying plant (in case of first deliveries and returns), we are moving goods between storage locations and creating WIA invoice. The initial problem with that is the determination of shipping and receiving country and fulfillment of requirement type 008 in pricing procedure. In our case plant has country key PL, and then Plant country key and receiving storage location is the same "PL". During invoicing this return flow we have in Analysis for WIA1-2-3 "Access not executed (Requirement 008 not fulfilled)" for access seq CoCo/Dep.Country/Dest.Country which is correct acc.seq for this flow.