Replace PPM ID with PS

Aug 07, 2017 at 03:25 PM


avatar image


We have implemented, PPM integration to PS and it works fine..!! Since we are already using PS ( and have a number range for Project & WBS), we would like to use the same number for PPM as PS.. For E.g., PPM creates a project with 14XXX and PS creates ZZ-101010, at the end of save of PPM we would like to overwrite 14xx with ZZ-XXX.

For this, we tried to modify the entry in table DPR_project-PROJECT_ID via BADI WORKBREAKDOWN_UPDATE. The method On save is triggered on PS project creation. For sometime the values are changing in DB.

However, after changing the value in BADI , when control goes back to PPM ( from PS), the values are again reset to 14XX and there is no change in Project_ID.

Please advice,the best approach to change the ID in PPM ( Any PPM BADI) etc..

I have already looked at DPR_ATTRIBUTES & DPR_DEMO_SUBSYSTEM and it did not help. Also Generate number range method is triggered before the PS project creation. We are looking for event/BADI which is triggered after the PS project is created and when the cotrol comes back to PPM system from PS.


10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers