Hi,

I have defined a parallel sequence for a material in routing. Say material has 4 operations 0010, 0020, 0030, 0040. I am having 4 diff work centers for the four operations. Now the output of the 2nd operation 100 and the capacity of the 3 workcenter in 50 so I want utilize the parallel sequence. Now while creating a production order, system is by default selecting the std. sequence and when I go for confirming the the operation 0030, i should get two workcenters for confirming the qty. My requirement is to confirm the qty against the actual workcenter where it is performed

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi refere to this link It will give u the idea how Parallel sequence works

http://help.sap.com/saphelp_46c/helpdata/en/b1/c042f8439a11d189410000e829fbbd/frameset.htm

If helpfull reward points

Regards

Dhananjay

Former Member
0 Kudos

Hi,

In order type dependent parameter set for manual selection of routing, so that u can select routing manually when creation of order.

Regards,

Suhas

Former Member
0 Kudos

Thanks for the resp. But actually I can change my sequence manually while confirming but if opern 20 is the branch operation and 25 is defined in parallel sequence, while confirming if I confirm 50 on 0020 and 50 on 0025 and if now I proceed to opern 30 and try to confirm the total 100qty it shoes erro that previous operation conf qty doest not match with the final conf.

Former Member
0 Kudos

Hi Umesh,

Check while release the production order which sequence you haev released

IF you didnt replease op 25 then it is error

Thanks

Bala

Former Member
0 Kudos

Hi,

while confirming the order I am facing a problem. while confirming operation 20 and 25, the system is accepting the total qty. for individual confirmations. which is wrong, if I confirm 50nos. against operation 25, it should automatic give rest 50 nos. against operation 20. same control keys are kept for the operations PP01.

Pls let me know how to avoid this duplicacy while using parallel sequence.

Thanks in advance.

Former Member
0 Kudos

Hi Umesh

you need to check oss notes Note 71003.

!!!!!!! You must also consider Note 106639

if it is useful reward

Thanks

Bala

Former Member
0 Kudos

Hi bala,

I have gone through the notes but I am still confused. When confirming both operation with same control keys, the system accepting total qty. against every operation which is wrong.

Awaiting for yr comments.

Thnks & Rgards,

Umesh