Hi,

I have defined a parallel sequence for a material in routing. Say material has 4 operations 0010, 0020, 0030, 0040. I am having 4 diff work centers for the four operations. Now the output of the 2nd operation 100 and the capacity of the 3 workcenter in 50 so I want utilize the parallel sequence. Now while creating a production order, system is by default selecting the std. sequence and when I go for confirming the the operation 0030, i should get two workcenters for confirming the qty. My requirement is to confirm the qty against the actual workcenter where it is performed