How to use reduction Strategy in SAP PS?

I have configured, the reduction Strategy and there are five reduction levels. I need the duration to reduce the duration of the activity in Critical Path. We are not using the Capcity Planning. I need to reduce the during of activity by 20% by using the reduction level. Kindly guide me how to run the reduction level.