I have configured, the reduction Strategy and there are five reduction levels. I need the duration to reduce the duration of the activity in Critical Path. We are not using the Capcity Planning. I need to reduce the during of activity by 20% by using the reduction level. Kindly guide me how to run the reduction level.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers