Hi
We have seperate Disaster recovery (DR) system. How the changes which are happened in Production System should be syncronized with DR system.
if any crashes happen, only DB backup restore is enough or else?
We are using EP6 SP9.
Please explain how the typical portal DR system should be designed. send the links for the documents related to this
Regards
Ganesan S