on 07-31-2007 12:05 PM
hi
where we integrated with sd
Hi,
Mainly in Make to order scenarios & Variant configuration scenarios we have close interaction with SD.
Regards,
SDS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
By using Strategy 20 or 40 you will have integration with SD as you are defining the Reqt type and class for customer requirements.
When you use order bom then you will have link with SD.
Availability check is the other point where PP integrate with SD
Regards
Ranga
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Availabilty check and TOR(Transfer of Requirements) is the Indegration point with PP-SD
Gopi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
PP integrate with SD takes place through
Sales order Make to order planning strategy
Availability check
Component reservations are created when the production order is created. The reserved materials cannot be issued from stock until the operation to which they have been assigned has been released.
Goods receipts for the order can be created in the form of partial deliveries, or as the complete quantity. Goods receipts update the "Put in stock" field in the order.
The goods issue and / or the goods receipt processes can be automated. Using back flushing, for example, you can automatically post goods issues based on a confirmation. You can automatically post a goods receipt transaction based on a confirmation.
Each goods movement (for example, finished goods to warehouse) is assigned a movement type in the system. Movement types enable the system to find predefined posting rules that determine:
How the stock and consumption accounts are to be posted
How the stock fields in the material master record are to be updated
What input (for example, production order number) is required
please reward your points.
regards,
Mohan R
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Raj
With PP and SD its with requirment class and requirement type
Thanks
Bala
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Mr.Raj,
PP integration with SD takes place through
Sales order Make to order planning strategy
Availability check.
Regards
Mangal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.