integration with sd

Former Member
0 Kudos

hi

where we integrated with sd

Accepted Solutions (1)

Accepted Solutions (1)

former_member184627
Active Contributor
0 Kudos

Hi,

Mainly in Make to order scenarios & Variant configuration scenarios we have close interaction with SD.

Regards,

SDS

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi

By using Strategy 20 or 40 you will have integration with SD as you are defining the Reqt type and class for customer requirements.

When you use order bom then you will have link with SD.

Availability check is the other point where PP integrate with SD

Regards

Ranga

Former Member
0 Kudos

Hi

Availabilty check and TOR(Transfer of Requirements) is the Indegration point with PP-SD

Gopi

Former Member
0 Kudos

Hi,

PP integrate with SD takes place through

•Sales order – Make to order planning strategy

•Availability check

Component reservations are created when the production order is created. The reserved materials cannot be issued from stock until the operation to which they have been assigned has been released.

Goods receipts for the order can be created in the form of partial deliveries, or as the complete quantity. Goods receipts update the "Put in stock" field in the order.

The goods issue and / or the goods receipt processes can be automated. Using back flushing, for example, you can automatically post goods issues based on a confirmation. You can automatically post a goods receipt transaction based on a confirmation.

Each goods movement (for example, finished goods to warehouse) is assigned a movement type in the system. Movement types enable the system to find predefined posting rules that determine:

How the stock and consumption accounts are to be posted

How the stock fields in the material master record are to be updated

What input (for example, production order number) is required

please reward your points.

regards,

Mohan R

Former Member
0 Kudos

Hi Raj

With PP and SD its with requirment class and requirement type

Thanks

Bala

former_member184655
Active Contributor
0 Kudos

Hi Mr.Raj,

PP integration with SD takes place through

• Sales order – Make to order planning strategy

• Availability check.

Regards

Mangal