HI ALL,

I AM CREATING PRODN ORDER MANUALLY THROUGH CO01 IN ONE OF MY PLANT THE SYSTEM IS GIVING ME THE ERROR LIKE I AM CREATING ON CURRENT DATE 31.07.2007 AND SYSTEM IS GIVING ERROR MASSAGE 30.07.2030 DATE COMES AFTER END OF VALID FACTORY CALENDER.ALSO THIS PROBLEM IS RESTRICTED TO SOME OF THE FERT MATERIALS ONLY.

PLS. GIVE YOUR ADVICE

THANKS

R SEHGAL

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi

Check the factory calender assigned to ur plant in SPRO.Assign some other factory calender which is having validity date from current date to some years.

Gopi

Former Member
0 Kudos

som the system took the preset date and it ignore the entered dates.

so you have remove the preset date in change mode and make it check with the transaction code SCAL.

Former Member
0 Kudos

Hi Rakesh,

Please check the factory calendar in SCAL which is used in workcenter capacity.In shift intervals (workcentr-capacity--interval and shifts)please reduce the validity period to say 2010 and also maintain factory calendar to 2010.

Regards

Ranga

Message was edited by:

Ranganathan Srinivasamurthy

former_member221041
Participant
0 Kudos

Dear Ranga,

pls. tell me where to see the extension of factory calender to bom and routing validity period.

thanks

r sehgal

Former Member
0 Kudos

Hi rakesh

Check you factory calendar t.code SCAL

reward if it is useful

Thanks