Break Schedule

Former Member
0 Kudos

Hello Experts,

Please help me incorporating 3 different schedules in one single daily work schedule. There is not Shift work concept. In daily working time from 9 am till 6:15 PM, i need to insert 3 breks one of "half an Hour" and 2 breaks of 15 mins each. This is what i have done:

Group personnel subareas for work schedules n daily work schedules.. here i'm assigning to my <b>PS grouping</b> .

In <b>break Schedule</b>, I'm creating 3 diff breaks to be included.. all paid and assigned to my DWS grouping.

In <b>daily work schedules</b>, I'm assigning the working time and weekly off sunday to my DWS grouping.

In <b>Period Work schedule</b>.. I'm assigning the normal working and Off day.. ^ Working and 1 free as i have created.

In <b>Daily Work schedule Node</b>, for my Grouping, I select my working time or Daily work as configured, below that is the <b>Work break schedule</b> and i can choose only 1 out of the 3 breaks. I want to know how can i include all the 3 breaks in my daily work schedule details.

Please advise on this. Very Urgent

Thanks and Regards

Rosalin

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

I had done the same.. as I had mentioned, but was not sure about this. Thanks for the suggestions.

Thanks & Regards

Rosalin

Former Member
0 Kudos

My DWS Grouping is 99. I have made Breaks "BRK" with sr. number 1,2,3 and assigned the time. 99 BRK 01, 99 BRK 02, 99 BRK 03

Then Created my Daily Work schedule (Working 6 days and Off 1 day)

In detail of this: I give my DWS Grouping, Create my DWS Selection Rule,

Planned working hours.

In the Break Tab, we have Braek work schedule: when I click that: it displays all the 3 break work schedules that i created.

I would like to know which one is picked up , I am able to select only one of the 3. Or even if i choose one all the 3 are inserted into this. Please clarify that.

Regards

Rosalin

Former Member
0 Kudos

Hi,

Include BRK 1. So that, i will look all the sequence of that Break schedule.

Good Luck

Om

Former Member
0 Kudos

hai

just assign brk.

it will take all the breaks that are under BRK

for checking whether it has picked up all the three

generate the wsr rule and double click on any day

it will show all the braeks

regards

nalla

Former Member
0 Kudos

Hi,

Double clicking on any day, shows the detail, wherein I see "Work Break Schedule" I see BRK. When i click on the option, I see all the 3 breaks and only 1st one highlighted in "Yellow" color. Does it mean only that the 1st has been chosen or all the 3 BRK?

Regards

Rosalin

Former Member
0 Kudos

hai

once it shows all the three it means it has ta all the three

regards

nalla

Former Member
0 Kudos

Hi Rosalin,

It should vary by Sequence number of same category break.

Good luck

Om

Former Member
0 Kudos

hai

if u want to assign all the three breaks

in breaks configuration give the brak neme same and then give serial number 1,2,3

dont name the three breaks differently.

it should be like

say grp brak sno

01 brk 01

01 brk 02

01 brk 03

then when u r picking up brk and assigning all the three will be assigned

regards

nalla