on 07-27-2007 7:59 PM
Hi SAP Gurus, can someone help me solving this problem:
My client need to run time evaluation for 2-months period ahead of time. But every time I tried, time evaluation always stops at end of the current month, no further dates in the future. I had created attendance data 2002 for all the future dates. IT7, 2002, 2006 and all configurations seem to be OK (T510S,T569R). Test run is also OK with good future results. What could possibly be missing? Thank you in advance.
Bill
Hi,
Check your configuration steps in the Schema.
Good Luck
Om
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank you very much, Arun, Banu, Stefan and Om.
Yes, I have entered the "Evaluation up to" date (60 days later);
The schema has a function "Check FUT".
Test future run result was generated correctly.
Still I can't have future results in real run.
So, what else I should check into?
Thanks again.
Bill
HI,
Check Time schema whether have you coded for future if it is live run.
Prakash
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Did you put a future date in "Evaluation up to" date in PT60?
Does the system gives any error?
Hope this helps,
Reward points if helpful,
Thank You,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.