Dear Experts,
We have a production process in which there are four operation A, B, C and D. A is a in house operation and defined in standard sequence. B and C are sub-contracting which are defined as parallel sequence. And after operation B and C the fourth one is the in-house operation D and part of the standard sequence. Now the raw material issued to operation A produced two intermediate materials of which one is sent to operation B and other to operation C . And the output of B and C assembled in Operation D. How the BOM for this process can be mapped.
Thanks.
Hello ,
For your req, You need to create 3 BOM.
D Material BOM Will have components as B and C Materials .
B Material BOM will have component as A Material.
C Material BOM will have component as A Material.
Regards,
Kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Kumar .
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.