cancel
Showing results for 
Search instead for 
Did you mean: 

Study material for planning strategy 21

Former Member
0 Kudos

Dear All,

I have triggred the project through planning strategy 85 when i am making a quotation.The account assignment is done for the project.The planned cost in the network is updated in the quotation.But i am not able to get the activity cost in the

WBS element though it is available in the network level.

Is there any other setting to be done in the IMG ?

My client scenario needs a close interaction(flow) of data from PS to SD

I am trying to do DIP profile and Resource related billing.

I also understand that i may have to use planning strategy 21.Can some one kindly provide me detail study material for planning strategy 21

Rewards are assured for timely & valuable help.

Thanking you,

Best Regards,

R.Srinivasan

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Srinivasan,

Please refer the following link on Assemly processing.

http://help.sap.com/saphelp_46c/helpdata/en/95/1613a8837b11d2b6700000e82d8bd1/frameset.htm

Assembly processing in SAP PS explains the link between SAP PS module & SAP SD module.

It is pretty exhaustive and explains settings in material master,maintaining standard network,billing plans and assembly processing,settings for configuration and linking materials and standard networks.

Regards

Tushar

P.S. Do reward points if you find this info useful.