I am new and searching about this but couldn’t find solution. We have disceret manufacturing and while creating cost estimate of materials in CK11n, I am selecting Cost lot size as 01 in initial selection screen but when I press enter lot size gets change in cost tab to 100.

Costing lot size is 01 in material master. BOM and Routing also have Base quantity as 01. We are using costing version 99 and Mixing ration are also maintained with lot size 01.

I want to know from where it is picking lost size as 100 automatically even after the selecting 01 in selection screen?

Screenshots are attached.

ck11n

MM03

CK95

Your prompt reply will be highly appreciated.

ck11n-1.jpg (113.1 kB)
ck11n-2.jpg (45.9 kB)
mm03.jpg (31.0 kB)
ck95.jpg (31.5 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    Aug 02, 2017 at 05:59 PM

    Hi

    Did you check SAP Note 402440 ?

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Thanks for your reply. No beacause i don't have id and password. If you have details kindly share.

  • Aug 02, 2017 at 09:02 AM

    Hi,

    You are trying to do standard cost release for mixed costing. For mixed costing you will not allow to pass lot size. So system ignore the lot size passed by you in initial screen and take lot size from material master.

    Regards,
    Malay

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Thanks MALAY for your reply....

      In material master costing lot size is 1 but during cost estimate its taking 100. I attached the screenshot also.

  • avatar image
    Former Member
    Aug 06, 2017 at 05:20 AM

    Dear experts, any other point to consider except material master?