blocking material for sales order

hi all,

I have blocked a material from basic data 1 view of X-plant material status and Cost estimate 1 view of Plant Specific Material by changing them to 02. but for this material i can still create sales orders or quotations in that case i want system to give an error message. how can i resolve this problem.

best regards

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

5 Answers

  • Best Answer
    avatar image
    Former Member
    Jul 24, 2007 at 07:48 AM

    Hi

    I have similar problem.

    Here you have a solution.

    Can I block a batch of material?

    Best regards

    Lukasz

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jul 24, 2007 at 08:03 AM

    Hi,

    For the Material which u want to block for sales process. goto mm02 t. code and goto basic data2 or basic data 1 view there we have a field called distribution channel specific status there u give it as blocked for sales process.

    go to va01 and give the material so the system gives a error message.

    try this .

    Reward If Helpful.

    Regards,

    Praveen Kumar.D

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jul 24, 2007 at 07:56 AM

    Hi,

    Use the material exclusion function:

    FUNCTIONALITY:

    SD> Master data > Products > Listing/Exclusion> Create

    ( Tcodes VBO1, VB02, VB03)

    Enter the list/exclusion type B001: For the required

    customer:

    Enter Maintain materials > Save > Exit

    Create the order and enter material excluded to test exclusion.

    CONFIGURATION: IMG SETTINGS

    For IMG settings; Go to IMG > SD > Basic Functions>Listing/Exclusion

    Ensure that the listing/exclusion procedure is activated for your order type. You can also create your own condition types access sequences and procedures or use the SAP provided ones.

    Reward points

    Regards

    Govind.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jul 24, 2007 at 08:06 AM

    Hi

    in X-plant material status select option check option "Blocked for quality inspection"

    Jai

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Apr 17, 2008 at 10:06 AM

    What Praveen has mentioned is absoultely right but the catch is that it is Distribution Channel specific...so be careful while opting this feature.

    Regards,

    N

    Add comment