Skip to Content
avatar image
Former Member

SAP EWM process order with backflush not working

Hi experts,

My system is EWM 9.4.

Step 1: Create a process order in COR1 with backflush indicator checked

Step 2: Release and stage the process order in ECC

Step 3: Create EGR document in ECC

Step 4: Stage the components in EWM and Warehouse tasks created and confirmed

Step 5: Perform goods receipt in EWM via RF device with the HU option

Step 6: The 101 document gets posted into ECC w.r.t the order.

Step 7: No automatic goods issue of components happen in ECC.

Please help if you find any system config/master data missing

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

6 Answers

  • Jul 31, 2017 at 12:24 PM

    Hi,

    Can you try this on a non-EWM storage location and see if it posts goods issue automatically? If not, the problem is caused by IM-PP interface and we cannot help you in this EWM section.

    Best regards

    Serhan

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jul 31, 2017 at 06:20 PM

    Yes, it work perfectly for IM and even for WM locations. The only time it fails to create is the moment we enter the EWM Sloc

    Add comment
    10|10000 characters needed characters exceeded

  • Aug 01, 2017 at 03:54 AM

    Hi Jyotirindra,

    Are you using PMR or Delivery Based Production Supply ?

    PMR->"When a material is set as backflush item in the manufacturing order, you cannot enter the goods issue in SAP EWM.

    When you enter a backflush in SAP ERP, SAP ERP creates a consumption posting delivery, as described in consumption for delivery-based production supply. You can configure the system so that it adds the goods issue document to the respective PMR item as well as to the consumption posting delivery. You can use this functionality to have the same information for all items in the PMR.

    You cannot use single-order staging for a material set as backflush item"

    Please check this Reference: Production Integration Types and let us know if you still facing issues.

    Kind Regards,

    Ajit

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 01, 2017 at 12:20 PM

    Hi Ajit,

    Thanks a lot for your advice. I followed your document and validated against each one of my settings in ECC and EWM. You can configure the system so that it adds the goods issue document to the respective PMR item as well as to the consumption posting delivery. The problem is, I'm not able to create the Consumption posting delivery in ECC for the backflushed order. Is there any Program/PPF/Profile I'm missing?

    Kind Regards,

    JG

    Add comment
    10|10000 characters needed characters exceeded

    • Hi JG,

      -> Are you able to create Consumption posting delivery manually in MIGO ( Goods Issue - Order then your Process Order ) ?

      -> Check Tcode COGI , Are you getting any items in this tcode ?

      Kind Regards,

      Ajit

  • avatar image
    Former Member
    Aug 01, 2017 at 02:12 PM

    Hi Ajit,

    No, I'm getting the message "Document XXXXXXXXX does not contain any selectable items in MIGO" with the backflushed Process order. Without backflush I'm getting everything in MIGO. Even in COGI, it says, "No record was found" for that Process Order.

    Kind Regards,

    JG

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Ajit,

      I tried a different thing today with backflush. I created a receipt in an IM location and issue in EWM location. Did a CORK, and the system generated a message that 2 deliveries created. I could not find the deliveries in ECC, neither in the queue. Then I searched the COGI and found that it's lying there with "Essential transfer parameters are missing in record: 000002". This might be the reason? Any idea Sir

      Regards,

      JG

  • avatar image
    Former Member
    Apr 12 at 04:18 PM

    Hi Jyotirindra

    Did you find any suitable solution? We are facing same issue with no backflush execution in ECC after EWM GR

    Add comment