Skip to Content
0
Former Member
Jul 23, 2007 at 08:26 PM

Change the pipeline to the Integration Server - Link or Steps needed -URGNT

42 Views

Hi,

Can someone please let me know the set of steps or blog link to configure the

" Maintain the pipeline to the Integration Server:

Change the pipeline to the Integration Server by running transaction SXMB_ADM "

which is to be done as part of the post installation steps for PI usage type in a Heterogeneous system migration.

Thanks

Sourav