cancel
Showing results for 
Search instead for 
Did you mean: 

Settlement of process order

Former Member
0 Kudos

Hi all

when running settlement for process order the cost is settling to a material which is assign to a cost element.

can anybody explain where the assignment takes place.we have checked the costing sheet but we are not able to find a finished goods assign to a cost element

Regards

Ansuman

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Settlement of orders are based on settlement profiles assigned to order type. you must maintain valid settlement parameters for the order. The settlement parameters include a settlement profile and a settlement structure:

Settleemnt profile contains settlement rule and The system automatically assigns a settlement rule to the process order when the order is created. The assignment is carried out via the default rule defined in Customizing.

The settlement rule includes one or more distribution rules for the production order. The distribution rule consists of a cost receiver, a settlement share and a settlement type:

The settlement receiver determines to which cost object the actual costs of the production order are to be settled. Possible receivers include

a material

a cost center

an internal order

a sales order

a project

a network

a fixed asset

The settlement share determines the percentage rate or the equivalence number to distribute the costs to the individual cost receivers.

The settlement type determines whether all the costs are settled which were incurred for the order (full settlement) or whether the costs collected on the order are to be settled periodically (periodic settlement).

Regards

TAJUDDIN

Former Member
0 Kudos

Ansuman

Normally the Material is linked to cost element through Valuation Class, In Material Master Accouting 1 view.

Then through settlement profile in Shopfloor control spro

That valuation class is material type wise and assigned through accouting category in spro, etc.

some one please correct me iam wrong

Also give additional integration points with transaction and link is appricated

K.Prabakaran

Former Member
0 Kudos

Hi Prabakaran

where u assign valuation class of material type wise and assigned through accouting category in spro.

can you explain it in details.

regards

Ansuman

Former Member
0 Kudos

This assignment comes in Material Management SPRO

The SPRO navigation is

Material Management-Valuation and Account Assignment-Account Determination-without wizard-Define valuation class

T.code is OMSK

I suggest you to get the help of MM consultant first and FI/CO for this clarification in detail

K.Prabakarn

Former Member
0 Kudos

Pl reward me point if answer is steping you up for solution

K.Prabakaran