Skip to Content
avatar image
Former Member

Alternative/Substitute materials / currently causing a negative at back flushing

Hello,

I have a HALB material with alternate/substitute materials, set up as follow

A1 Usage 1, strategy 2, usage probablity 100%

A2 Usage 2, strtaegy 2, Usage Probability 0%

for some reason when posting orders the system is creating negatives in the second item

inventory existing on Item usage 1 available

Item usage 2 zero inventory

Top level part one production version for posting orders

MRP set up working properly the error is only ocurring at production orders posting

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers