on 07-26-2017 2:20 PM
HI Experts,
We have business scenarios" "Quantity based effective"" in Engineering change management.
We need to set a qty and when stock reaches that qty the change number becomes effective.
SAP Standard provided effectivity parameters on DATE, SERIAL NUMBER, but i want stock based effectivity or quantity based effectivity.
Any guidance/Suggestions to achieve this?
Hello
There is no such concept in ECM. Try to combine ECMs with the discontinuation indicator in the material master.
Regards,
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi @caetano
I referred below link and tried out the same.
https://blogs.sap.com/2019/09/30/engineering-change-management-parameter-effectivity/
Vignesh V
Hi Vignesh
I'm familiar with parameter effectivity, but on the original thread Rajesh mentioned that he wanted to have stock or quantity based effectivity, which is not available in parameter effectivity.
By the way, I have just noticed that the original thread is from 2017 and we should be resurrecting these old threads. Please post a new thread if you have questions related to this topic.
Regards,
Caetano
User | Count |
---|---|
97 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.