on 07-26-2017 11:34 AM
Hi Gurus, we have maintained prod storage location A in material master for component of production order. in BOM and PV we have not maintained any prod storage location. this component is WM managed and control cycle is maintained for supply area, which is maintained for storage location B. Observed that in production order, the storage location B is copied. Could you advise what need to be done in order to have storage location A in production order. also advise how to link prod storage location to supply area?
Hello,
In BOM, you can assign both production storage location and PSA. Please share the screen shot of control cycle and supply area and material master where you have assigned Prod sloc
best regards
Shailesh Mishra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi, The question here is that which storage location (if storage loc is maintained in material master, bom, pv, control cycle) will be copied in production order? if we want storage location as per material master- mrp2 view (even though control cycle is maintained), what need to be done. please advise.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hello,
Sloc A and B assigned to same warehouse? Please confirm
B will be copied.
Shailesh Mishra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.