Resource overload in APO

former_member928177
Participant
0 Kudos

Dear All,

i am facing the problem of capacity overload of teh resource is not taken into consideration while planning. giving message : Resource WDWPBS018_1002_002: increase capacity overload is not taken into account.

In procedure it tells to reduce the PPDS orders.. But How can system can plan those resources if that are 100% loaded.

How system loads resource in case on SNP planned order and in case of PPDS planned order or production order.

Resource which is loading 100% more is loaded with 4 prod orders and 4 planned orders and both are consuming resource for 2 days comman.

If such problem persists does it affect any component allocation for particular operation aor something like that..

Points will be alloted for answer.

Thank You in advance..

Amol Chavan

Accepted Solutions (1)

Accepted Solutions (1)

former_member1230066
Participant
0 Kudos

Dear Amol ,

Check the capacity variant in your Resource and the settings of the capacity variant in t-code /sapapo/resc01 .

The following settings are available ... Minimum capacity , Normal capacity & blank field for maximum capacity . This message is directly to do with this setting for SNP optimisation output .

Regards ,

Prashant Kumar

former_member928177
Participant
0 Kudos

Dear Prashant,

Thank you for responce, but in our case this normal capacity and ax capacity mentioned as 0under status field for the varients defind. Might be u can help me how to read or impactof this settings on SNP opti run..

Regards,

Amol

Former Member
0 Kudos

Dear Amol,

I think resouce "WDWPBS018_1002_002" is a manpower resource which is attached to your SNP relevant resource. If your primery SNP relevant resource is having more capacity than manpower resource, then manpower resource becomes your bottleneck resource & planning takes place based on capacity of manpower resource. If you increase the capacity of manpower resource more that primery resource then planning will be based on Primery SNP relevant resource.

Regards,

Chetan

former_member928177
Participant
0 Kudos

Dear chetan,

Resource "WDWPBS018_1002_002" is itself is a primary resource we are not using any machine resource and is only relevant for SNP optimizer planning...

Regards,

Amol Chavan

Answers (1)

Answers (1)

Former Member
0 Kudos

Capacity on a resource where there are SNP planned orders and PPDs planned orders is not finite. You can overload the capacity on the resource as much as you want

you are supposed to use Capacity Levelling to spread the excess SNP planned orders.

pl check the following link for some more details

http://help.sap.com/saphelp_scm50/helpdata/en/90/d9733b570d474bba36bf443f7927c0/frameset.htm

former_member928177
Participant
0 Kudos

Hello harish,

sorry for late reply....Actually it is mentioned as "Finite Resource" in R/3 resource master. <b>WDWPBS018_1002_002</b>. And are SNP relevant in APO master

And also not maintaining any capacity varient...

Can you help me in this?

Regards,

Amol Chavan