Skip to Content

Why some weeks are not displayed in MD04 using Forecasting

Jul 21, 2017 at 07:46 PM


avatar image

I have material number 013190902 in SAP and this material is using forecasting, see the attached image (fisrt link) from MM03.

And the problem is, why MRP is not displaying some weeks from forecasting even the values of these weeks have been calculated. See the following image from MD04.

The material has weekly lot size, and has minimum lot size equal to 1,944.00

It is really strange because this materials works good in Test environment with same values.

Any ideas why the weeks are not displaying in MD04? Thanks a lot!

Today It is week 29 and MD04 only shows week 43 and so on...

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers