Hi All,
I need to configure ECC 6.0 systems on EP 7.0 for Business packege MSS 1.0(SAPERP 2005). .Can anyone help me about the same? Any Guideline document which indicates step- by-step how to proceed about creating / configuring ECC 6.0 systems on EP7.0, any SAP NOTE regarding the same will be of great help.We have installed the MSS 1.0 packege already on EP 7.0. We are in the process of configuring ECC 6.0 systems of the Business packege on EP 7.0.
Thanks,
Chetan.