Hi,

After selecting item in to Shopping cart, in Cost Assigment if I select "ASSET" insted of Cost Center and I entered Asset number and then click Check button.

So now it will popualte all the Cost Assigment field values.

problem is its not pulling the correct Functional Area value for this Asset.

Its pulling different Fucntional Area value(I checked backend AS03 tcode ) .

Please let me know what could be the problem?

Thanks a lot.