Hi all,
I have 3-4 PPM's per product,
that differs in production times or components used.
Can someone tell me how can I optimize the selections of PPM.
PP/DS does not interested in optimizing the correct PPM,
rather it solves inside PPM's by modes.
But I want to solve first the correct PPM according to the costs, delays, prod. time etc. An then scheduling comes.
How can I do that, SNP, CTM???