Selection between different PPM's in APO

Hi all,

I have 3-4 PPM's per product,

that differs in production times or components used.

Can someone tell me how can I optimize the selections of PPM.

PP/DS does not interested in optimizing the correct PPM,

rather it solves inside PPM's by modes.

But I want to solve first the correct PPM according to the costs, delays, prod. time etc. An then scheduling comes.

How can I do that, SNP, CTM???

Mehmet

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jul 10, 2007 at 01:08 PM

    Hi Mehmet

    As you are Absoutely right PPDS solves by modes

    if You have different input Component then the production version have to be created in ECC. CIF as PPDS PPM and Convert them into SNP PPMs where you can actually Select PPM by Cost , Priority etc using Optimizer

    Try Also REM Heuristic In PPDS it Picks Up the different Production Version(Please test it Extensively Before Use)

    Rajan

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 10, 2007 at 12:15 PM

    Hi

    Please explore in CTM

    CTM may address your requirements

    regards

    Vijay

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 10, 2007 at 12:40 PM

    Hello Mehmet -

    Look into PPM priorities. Assign the priorities to them. also try using PP/DS CTM. that way ppm priorities will be taken into account.

    Regards,

    Suresh Garg

    Message was edited by:

    Suresh Garg

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 13, 2007 at 04:37 AM

    Hi Mehmet

    Let us try to understand your problem you have to prepare Product A which can be made on 2 work center WC1 and WC2 for which we have made two PMMs , PPM1(WC1) and PPM2(WC2) they have two Different Input Component B1(PPM1) and B2(PPM2),

    Now if i use SNP Optimizer without giving the priority the system will randomly Pick one of the PPM let Us say PPM1 and start Planning and load the WC1 if it not able to meet the date the system will search for the WC2 which is not loaded that is second PPM2, If still it is not able to meet the date it will leave the Plan unfullfilled.

    Do let me know for any further Clarification

    Rajan

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Rajan,

      Let us go on further in your example,

      Think that it's multilevel issue,

      Component B1 is in stock (or easy to produce)

      but WC1 is fully loaded,

      Component B2 is not in stock ( or hard to produce)

      but WC2 is empty.

      How will the system make the optimization, will it take into account

      the delay cost, production cost, capacity utilization and

      exactly WHERE should I place this, SNP or CTM,

      in terms of optimization between versions?

      Mehmet

      Message was edited by:

      Mehmet DEMIRBAS

  • author's profile photo Former Member
    Former Member
    Posted on Jan 21, 2008 at 11:39 AM

    U can plan ppm / pds selection , when u run snp heuristic or snp optimizer

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.