on 07-10-2007 6:28 AM
Hi PS gurus,
Request pl let me know is there any standard report which can give details of AUC details projectwise before or after capitalisation of projects.
Thanks in advance
regards
Srihari
Hi Srihari
Try T Code CJID ..
Enjoy SAP...
Regards
Sudhakar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi sudhakar,
i have tried with cjid but not getting desired info.
i have to know the AUC positings after capitalisation of project. auc postings are possible if the project is not closed. Once the project is closed at cj02 level, then the AUC is deactivated, u can see deactivation at as03 with auc no. in this case no one can post any costs in network-wbs-auc
My requirement:
After capitalisation of project, if the project is not closed by project dept and the project engineer is booked some costs and done gr/ml81n in network of the same project, then the costs are going to sit in network, and then we have to do cj88 to move from network-wbs-auc, in this case i would like to see the auc postings in any standard report. is it possible. ?
pl help if any solution available.
thanks in advance
regards
srihari
Hai
As of SAP standard - there is no such report but u can see in table - ANLA and the same can be downloaded into excel or word or the same can be sent as report.
ENJOY SAP PS and AWARD POINTS
Regards
PP
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.