Budget Availability Control for Maintenance Order

Hi,

Can anybody tell me that how to activate Budget Availability Control for Maintenance Order ? For Internal orders, it is already activated but for Maintenance Order (Category 30, type PM01), it is not activated.

Please tell the procedure for activation for the same.

Thanks in advance,

Regards

Satadal

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jul 06, 2007 at 06:40 AM

    Hi,

    I wonder if this possible. But normal procedure for maintenance budgets, is creating a project structure in PS and budget this. When creating a PM order you can link this order (automatically) to the proper WBS-element. Costs that will be made on this PM order are checked against the budget of the WBS-element.

    Regards,

    Paul

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 12, 2007 at 06:38 AM

    Thanks all, my problem has been solved.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.