version

For single BOM (one production line) do I need to do Production

Version? whats the purpose of using Prod. Version for single BOM?

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jul 03, 2007 at 10:39 AM

    Hi,

    Production version is a combination of routing & BOM. For every set of combination u can give a one production version.

    In PP/PI production is default in recipe.

    While creating production order you can choose it, or at the time of creation of PIR also.So that system will read the desired data.

    Regards,

    Suhas

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 03, 2007 at 09:57 AM

    Dear Bakyaraj,

    <b>Production versions are maintained at material level and it's not maintained for separate BOM.

    For a HALB or FERT material type production versions are maintained.

    Production version's are generally used in REM scenario.

    It can be used in Discrete too.</b>

    This is the help contenet given in SAP.

    Production verion is nothing but a Key which determines the various production techniques according to which a material can be manufactured.

    The production version determines the following:

    the BOM alternative for a BOM explosion

    the task list type, the task list group and the task list group counter for allocation to task lists

    lot-size restrictions for repetitive manufacturing.

    It links the BOM & rate routing for a material.

    You can create one or more production version for a material.You can see this indicator in MRP4 view of a material.

    <b>Production version is required because it's required to create product cost collectors for the materials for which a cost is to be captured in REM scenario.</b>

    Thanks & Regards

    Mangal

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 03, 2007 at 09:59 AM

    Bakyaraj,

    If it is REM it is mandatory otherwise no.

    Regards,

    Prasobh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 03, 2007 at 10:00 AM

    No need in discreate manufacturing but must in repetative manufacturing as the data for the prod line will be taken from prod version only.

    In discreate master data seelction will be taken from order type dependent parameters.

    if any question let me know with rewarding suitable points.

    regards

    TAJUDDIN

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 04, 2007 at 05:43 AM

    Hi Raj,

    In REM process it is mandary data , as it contais the rate routing and BOM , it define that which BOM and rate ruting you are going to use, like inmanufacturing of coca-cola there are 2 production line one is 300ml and another is 200 ml , the product is same coke but SKU is different , BOM is also differnt but the technology/ metodology of production is same .

    SO in this scinario you go for prodction version 0001 for 300 ml and another 0002 for 200 ml where you are specifying that which BOM and routing is selected for 300 ml line and 200 ml line

    Hopes you clear..

    Regards

    Siddhesh

    Message was edited by:

    Siddheshwar Rajguru

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.