Skip to Content
author's profile photo Former Member
Former Member

Adding checks in MM through VOFM transaction.

HI,

I have a requirment to add new checks in MM through VOFM transaction. by following the menu 'VOFM ->Requirments ->pricing.

now how to add new entries in this table. if i add a new routine it ask for modification key for generated program.

Can i add my checks here. or edit the old ones.

Thanks.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jul 03, 2007 at 06:28 AM

    Hi,

    The procedure to create the new VOFM.

    1. Go to VOFM transaction

    2. Page down until you find a new spot on the page to put in the VOFM number and description.

    3. Put in the VOFM number and the description of the VOFM.

    4. Now the VERY IMPORTANT part of the process. Double click on the VOFM description not the VOFM number to create this as a Development/Correction and not as a repair. If you double click on the number then this copies some existing code and prompts you for a repair.

    5. Activate and generate the VOFM routine. Note: Configuration must be setup by the OM team for this step.

    for example Go to the routine number that needs to be copied.

    Put your cursor on the routine number field that needs to be copied.

    Overwrite that number with your new routine number and hit enter.

    The new routine will be created as a copy of the old routine and you can modify the new routine as you need it.

    Ex.

    You have to copy routine 104 to 904

    Routine number Description Active

    104 Bill.bus.item data X

    Put your cursor on 104 and then change it to 904 and hit enter.

    904 will be created as a copy of 104 and you can make your changes in 904.

    Don't forget to activate it after you are done.

    refer the below link

    https://forums.sdn.sap.com/click.jspa?searchID=3604222&messageID=994791

    <b>Reward points</b>

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 03, 2007 at 06:19 AM

    Yes you can edit the existing routine.

    select the row corresponding to the routine number you want to edit. Then click on the the ICON source_text. you'll be taken into the source code of the copy routine. then you can edit it(provided you have the access).

    Reward points if helpful

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 03, 2007 at 06:23 AM

    Hi,

    What Agarwal saying is correct.

    If you have the access press insert modification button on application tool bar and it will allow you to write the code. write down your formula and acitvate.

    Reward points if useful,

    Aleem.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.