Skip to Content
avatar image
Former Member

Integration points between PDM module and Supply chain modules (PP,MM,QM)

Hi Gurus,

I would like to have a detail view of the integration points between the PDM and the supply chain modules like PP, MM and QM. Appreciate if you send me any doc on my id : saplogster@gmail.com

Thanks,

Paddy.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    avatar image
    Former Member
    Jul 03, 2007 at 04:41 AM

    Hi Paddy,

    The Integration depends on the Scenarios and on Requirements

    Like DMS will get linked with Material Master, Bill of Materials, Production order, Purchase Order, Sales Order etc

    Here you can link Different document types to Material types & even you can build a validation in the Numbering for DIRs & Material Master.

    Then Bill of Material also you can have one different type of DIR as Part List/ Item List and can be drawn a report out of it, but again depends on Requirements.

    Similarly you can link different Document Types with different purposes like in Inspection plan/inspection method/quality report can also have link with particular DIR configured for.

    In case of ECR/ECO you can link any object to ECR and can have a control of version/revision on that object

    ECR/ECO can be continued of ORDER CHANGE MANAGMENT (OCM) where in you Production Order/Purchase Order/Sales Order changes can also be tracked and control as well.

    These is how you can have a different Integration with PP, MM, QM as per the requirements.

    Regards

    Rehman

    Reward Your Points

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Rehman,

      Points awarded !!

      I am leaving this question open for any other usefull feedback from the experts.

      Thanks,

      Paddy

  • avatar image
    Former Member
    Jul 04, 2007 at 03:14 PM

    Hi,

    In case of external PDM system we need to comunicate through BAPI using the CA-PLM

    thanks,

    surya

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jul 04, 2007 at 02:22 PM

    Hi Paddy,

    we can link the PDM to the MM PP QM through the customization this will in turn provides tab screens through CV01N .

    During creating a document type along with status we wnned to define the object links also for linking with R/3 objects. these are the knodes to connect the PDM to other R/3 objects.

    SAP provided some R/3 objects only(ex. Materialm master(MM) vendor(MM), Customer(SD) Network(PS) Measuring points(QM). if you want to link some new object, in that case we need to create new tab Screen and program and attach to the documet.

    i think you know the path for defining the object links. the re the connecting points.

    thanks ,

    Surya

    Add comment
    10|10000 characters needed characters exceeded