Reorder Point Planning

Former Member
0 Kudos

Reorder point Planning.(ROP)

1.How to take the MRp for the Material which are subjected to ROP??

2.How to get the List of Mataerial of ROP

3.How can I get the List of ROP material for which PR has been generated.

I have to 3000 material for ROP

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

1. You can run MRP as a normal MRP run using MD01/MD02 or as a Back ground job using MDBT.MRP run will plan for all the materials based on the planning type(MRP) type assigned to the material. So, Material having the ROP also will be considered in MRP run.If stock is below ROP level, MRP run will create requirements.

2. In table MARC, u can get the materials having the ROP planning.ROP has both manual reorder and Automatic reorder point planning procedure.U can get the data based on the field MRP type:DISMM.

3.If you have different MRP controller for these ROP materials , u can get data easily from EBAN table.Other wise u have to write a querry by linking MARC and EBAN tables.

Regards

Ramakrishna

Answers (1)

Answers (1)

Former Member
0 Kudos

Any Clue for the Below Queries.

Former Member
0 Kudos

Hi Rahul

Have u gone thru the reply given?????

Regards

Ramakrishna

Former Member
0 Kudos

Sorry Dear Ramakrishna,

While I was replying u had posted it.

Sorry ...