How to set MRP by MD04

Former Member
0 Kudos

Dear

I have Material master by setting in view MRP1 like below :

MRP Type = VB

Reorder point = 10

rounding value = 5

Now, my Stock on hand = 10

When I use tCode MD04 for listing stock/ Requirement the result "MRP element" for PurRqs nothing, so I can't Create PR by MD04

but if when my stock on hand = 9, I found that

Now My question : How to set for MRP, in order to "When My stock on hand = Reorder point then I can use to create PR by MD04 ?"

thanks

imron

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

The system will not generate a P req until the stock has fallen BELOW the reorder point (not equal to it).

So if you want the system to generate a P req when the stock reaches 10 you need to set the reorder point at 11.

Steve B

Former Member
0 Kudos

dear Steve B

OK, thank u for your solution

regrads

imron

Former Member
0 Kudos

Hi,

You are most welcome.

Steve B

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

Run MD03 and then see MD04. You will find PR for the quantity based on your lot size.

To get requirement, your available stock should be < reorder point.

regards

sairam