on 07-02-2007 10:12 AM
Dear
I have Material master by setting in view MRP1 like below :
MRP Type = VB
Reorder point = 10
rounding value = 5
Now, my Stock on hand = 10
When I use tCode MD04 for listing stock/ Requirement the result "MRP element" for PurRqs nothing, so I can't Create PR by MD04
but if when my stock on hand = 9, I found that
Now My question : How to set for MRP, in order to "When My stock on hand = Reorder point then I can use to create PR by MD04 ?"
thanks
imron
Hi,
The system will not generate a P req until the stock has fallen BELOW the reorder point (not equal to it).
So if you want the system to generate a P req when the stock reaches 10 you need to set the reorder point at 11.
Steve B
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Run MD03 and then see MD04. You will find PR for the quantity based on your lot size.
To get requirement, your available stock should be < reorder point.
regards
sairam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.