on 07-02-2007 6:59 AM
Hi Gurus
can anybody explain me the diffrence between Daily requirements and Individual reqmt.which are used in avalabilty check in MRP3 view of material master.
thanks in advance
kk
Hi,
In scope of check checking group and checking rule are assigned,
Again checking group is assigned in MRP 3 and checking rule is assign to checking control.i.e. PP. Material is being checked as per setting in scope of check during order creation & order release. Also as per setting in checking control.
If u enter 01 system will carryout availbility of material where 01 group & checking rule is assigned in scope of check.
Regards,
Suhas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kedar,
If you set 01 as a daily requirement in stock requirement list (MD04) u can see the total requirement in a day.
If u set 02 as a individual requirement in stock requirement list will show the requiremnt individually.So that we can can see the requiremnt of each order seperately.
It will help u.
Regards,
Suhas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
For ex if a 2 sales order comes today for same material then in MD04 it will
be shown as cumulated qty if you set the availability check as daily reqmts.(01)
Two sales order will be shown separately if you set availabilty check as individual reqmts.(02)
Regards,
nandha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.