cancel
Showing results for 
Search instead for 
Did you mean: 

Availability check at planned order

0 Kudos

Hi

I need opinion over below issue-

Suppose material has certain stock. This is a dependent material component -having planned orders for header materials in MD04 screen. If there is shortage of qty. at individual planned order level, what I expect that based on requirement date of planned order, the material quantity should appear as committed quantity in MDVP. Once its stock is fully availed for existing planned orders, for remaining planned orders, the quantity should be appear as deficit.

Is it possible? Kindly reply.

Configuration setting for Availability check is enclosed + Full confirmation logic is activated at MRP group level.

availability-check-setting.jpg

Regards,

Nitesh

Accepted Solutions (0)

Answers (1)

Answers (1)

shailesh_mishra5
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello Nitesh,

Please look for exploring below settings. Here you can set the availability check of planned order in 4 different ways.

1)If the flag= blank, suppose Available stock = 100 pcs and planned order=10 pcs, then the planned order is not added to the available stock. Available qyt=100 pcs only in CO09

2) If Flag = “X” (Check all planned orders) : Available stock = 100 + 10 =110 on the date of the planned order

3) Flag = “A”: Available Stock = 110 on date of planned order only if firming indicator set in planned order.( by MRP firming types or by manual)

4) Flag = “B”: Available Stock = 110 on date of planned order only if components of the planned order are confirmed.

Best regards

Shailesh Mishra