Skip to Content
author's profile photo Former Member
Former Member

How to check Access Sequence for MM output condition type?

Dear Experts,

I've got missing features for output message determination in all

function module such as Inventory Management, Purchasing and Delivery in our development client environment. This happen al the customizing has been transferred into my testing client environment.

I could not determine any output type that I have created even though

I've completed every single output type condition table and procedures.

There is no issue for such this case happened earlier and worked fine

in our testing client. Please kindly give your solution and advice on

this matter.

Steps for the Reconstruction

1. Create own access sequence -> Z002 with Plant, Sloc and Mvt Type as key fields.

2. Create new Condition Table --> B502 and B503 with Plant, Sloc and Mvt Type as key fields.

3. Create own output type --> ZDRV and ZITS for ME application (IM) that used above output condition

4. Assign both output into procedure ME0001

5. Maintain Condition Type for relevant output

6. Assign own printing program for both output

Once setup completed then I can just create any material document that have match with relevant key fields value.

Any idea, how to check my customization is correct in development client?

And how to check the access sequence can be worked properly during creation of related material document?

I really appreciate any feedback on this matter... thanks.

Best Regards,

Girang

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jun 30, 2007 at 09:35 AM

    Hi Girang,

    the settings in MN05 for PO, MN22 for IM is not transported this has to be setup in production have you done this.

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Ranganath,

      I believe I have done the steps that you mentioned. Please noticed that my case is not relevant to my production environment.

      My setting are working fine in our production system, which it was transported from the development but some how my development client is changed with none of us could be traced it back.

      So could you advise any program or t-code for checking our access sequence of the respective output condition can be determined.

      Best Regards,

      Girang

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.