Skip to Content
0

How to plan multiple product on one work center in SAP S/4 HANA

Jul 17, 2017 at 03:29 PM

143

avatar image
Former Member

Hi,

Scheduling of multiple product on single work center is a challenge for me right now. please suggest if any solution

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Best Answer
Caetano Almeida
Jul 17, 2017 at 07:53 PM
0

Hello

Can you please describe your issue in more detail? Why is this a challenge for you?

Regards,

Caetano

Show 6 Share
10 |10000 characters needed characters left characters exceeded
Former Member

currently i am unable to plan multiple product on specific work center at same time. as CM21 does not allow to schedule multiple product on one work centre.

Details: My work center is my machine with multiple section, and i can plan different product in each section as and when required.

Work center is glass manufacturing machine

and product is glass bottle

(sometimes i plan two almost identical bottles on same work center at same time)

0

Hello

You can create individual capacities for your work center and use the proper profile to plan the individual capacities in transaction CM25. Another alternative is to use the Shop Floor Dispatching and Monitoring Tool, that is an Add-On for the SAP ERP and focus in the individual capcities.


Regards,

Caetano

0
Former Member
Caetano Almeida

Hi,

I have checked CM21, CM25 & CM27. But not even a single allows me to plan multiple product at a time. (Parallel jobs on same work center).

Is it possible to configure anything on routing level or work center level to accommodate multiple products on single work center at a time.

0

Hello

First you must define the number of individual capacities in your work center, then you should use the correct profile, such as SAPSFCG005

Regards,
Caetano

0
Former Member

Mr. Caetano,

Thanks for the reply. Will check the same in CM25 and revert

0
Former Member

Mr. Caetano,

I have checked the scenario using the individual capacities option of work center and spitting function.

and while creating order changed the split number and planned multiple product at same time and on same work center.

successfully tested the scenario.

thanks for your revert on the query.

0