Skip to Content
0
Former Member
Jun 28, 2007 at 09:00 AM

Input Material Number in MATMAS

394 Views

I would like to create Material Master using IDoc:

1) Basic Type MATMAS05

2) Message Type MATMAS

3) Process Code MATM

I encountered 2 problems:

1) Since the Number Range of the Material Type that I input is internal assign, I have not input the Material Number in the IDoc. However, I got an error message when posting the IDoc: "No material number transferred" (M3752)

2) I would like to use Message Type CLFMAS to create the Classification Data for Material. How can I link the 2 IDoc (MATMAS and CLFMAS) together when processing the 2 IDoc ?