on 06-27-2007 3:54 PM
Hi everyone,
I am trying to include additive costs in the preliminary cost estimates on a cost collector but with no luck.
I completed the following steps:
1. Modified the costing variants and valuation variants for the standard cost estimate and the repetitive mfg cost estimate to include additive cost (OKKN).
2. Created the additive cost estimate (CK74N) to add cost to the highest level material.
3. Created the standard cost estimate for the highest level material that included the additive cost (CK11N).
4. Marked and released the standard cost estimate (CK24).
5. Created the preliminary cost estimate for the cost collector (MF30) but it does not include the additive cost. There are no error messages and the cost estimate has a status of costed without errors.
I checked that the cost element is defined for the cost component structure used by both costing variants. I also checked the SAP support portal to see if there is any mention that cost collectors cannot have additive cost. None were found.
Any ideas?
Thanks,
Michael
Hi,
Check the following:
- The Costing variant & the Costing version yiu are using in CK74N & CK24N should be same.
- The validity dates of the Additive cost estimate should be within the validity dates used in CK24N.i.e the additive costs should be valid for the dates you are trying to mark & release costs.
Assign points if useful.
Regards,
Rajaram
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
29.06.2007 - 13:03:09 CET SAP Reply
Dear customer,
Having a similar past request in which customer are given this
comments:
Additive Costs are a Standard Cost Estimate functionality. Therefore
it is not possible to calculated them in the preliminary cost estimate
of a production order or product cost collector. You can see there is no valuation possibility on those costing variants.
Additive Costs can be used in the calculation of plan costs in the
following scenarios:
o cost for materials where a routing or BOM is still missing or
incomplete
o tests for a change of routing or similar.
At the 'real' production these costs should be already specified
and somehow integrated in the automatic costing. Thus the addition
of 'additive costs' is not standardized at this point.
Alternatively you could use the user exit 'EXIT_SAPLKASC_001' for your
purposes. You could use the exit to add overheads per quantity.
This user exit allows you to transfer values or quantities for a
calculation base to the overhead calculation. Please see note nr.
116808 for more information.
Hope this information helps.
With best regards,
Chin Siong
Support Consultant (Financial/CO)
|@KR@ SAP Active Global Support
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |