Dear guys,
What is meant by validating MRP results ?
How it should be done
Pl reply
guru
Hi,
You can check the MRP results in MD04 transaction.
Here you can check the stock & requirement details such as requirement date,Purchase requisition/Planned order dates/sale order details & stock situation.
You can also check the dependent requirements & check for error messages (if any).
Regards,
SDS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Planning Run:
Run MRP thru tcode MD02 Single item Multi level Planning
During Planning Run reqmts for a material are analysed and proc elements are
created.
Evaluations:
All the receipts and issue elements will be displayed
MD04 Stock / reqmts List
Md05 MRP list
MD06 collective access to MRP list
MD07 Collective acccess to Stock/ reqmts list
After MRP Run if there is any critical situation this will be displayed in the form of exception messages.
Ex message 96 stock has fallen below the safety stock
message 10 Bring the process the forward.
message 15 Postpone the process.
message 20 cancel the process
Based on the results Mrp controller works whether Production need to be carried out at a particular date or need to postpone the production.
Regards,
nandha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.