Subcontracting PO (Urgent)

12 Views

Hi all,

We are facing a serious problem with subcontracting PO,

Scenario - A subcontracting PO is placed & the items are issued to the subcontractor. Most of the times the materials in the BOM gets updated after the items are issued (due to design modif's) & this is where the problem begins. At present we are facing big problems in updating the BOM in sub-con PO as it needs to be updated item by item.

- Would like to know is there anyway, i can update the sub-con PO with the new BOM all at once, instead of item by item.

- Also what movement is required to receive back to store, those materials which are no longer required in the new BOM

- Can i issue new materials to the sub-contractor referencing the same sub-con PO?

Would highly appreciate if someone could give the SAP flow for handling this issue ASAP.

Vivek