on 06-20-2007 8:45 AM
Hi,
can any body tell how requirement from forecasting comes in MC94,what are the required setting in master data , img etc.
pl explain with ex.
Basant
Basabt,
There are some configurations related to Forecast:
Check these:
Weighting Groups for Weighted Moving Average
In this step, you define the weighting groups for the forecast model
"weighted moving average".
In the forecast calculation, the weighting group in the material master
record makes it possible to assign a weighting factor to the historical
values. This means, for example, that you can weight the historical
values in the near past more than the values in the more distant past.
This weighting value is allocated per consumption value.
Behind each weighting group are several weighting factors. Every
weighting factor is allocated to a historical value.
Define Splitting of Forecast Requirements for MRP
In this step, you define:
o the periodicity in which forecast requirements are taken into
consideration and are split on the time axis in MRP
o for how many periods the forecast requirements are taken into
consideration in the net requirements calculation
The splitting indicator is defined depending on the period indicator.
The period indicator defines the periodicity used to record the
historical values for the forecast and the periodicity to be used to
output the forecast values.
However, this periodicity may be too large for the planning run.
Therefore, you can use the splitting indicator to,
o split monthly values into daily and weekly forecast requirements,
and to
o split weekly forecast values into daily forecast forecast values.
In this step, you can also limit the number of forecast requirements for
which the net requirements calculation is to be carried out.
To split the forecast requirements for a material, the splitting
indicator defined here is assigned in the material master record.
Note
The splitting of the forecast requirements is only relevant for capying
forecast values to MRP. It has no influence on the forecast execution.
Example
Month 1 2 3 4 5 6
Forecast values 100 100 100 100 100 100
The planning run should provide the following forecast values:
in the 1st month daily
2nd month weekly
3rd - 6th month is also taken into account
Here, you must set the following defaults in the system:
Number of days = 1
Number of weeks = 1
Periods = 4
The following forecast values result for material requirements planning:
Month 1: forecast requirements are created for every workday
Month 2: on the first workday of the week, a requirement of 25 is
created
Month 3 to 6: on the first workday of the month, a requirement of
100 is created
Planned orders are not created for the entire planning horizon but
only for 6 months.
Regards
Ram
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Basant,
Either you have to create requirements manually for your products or product group or upload through excel sheet with Zprogram similar to MC94. as per my knowledge there is no specific settings are requires in material master for the forecast requirements.
If want to do the forecasting then maintan forecasting view with forecast periods and perform forecasting from MP30. These forecasted values will be availabe in MD04 as forcreq but not in MC94. Real time inventaory data (consumption values) must exists for the forecasting.
Regards
TAJUDDIN
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.