on 06-19-2007 6:00 AM
Hi All,
How do I control the Doc Type of Auto PRs (MRP run) and Auto POs (ME59N)?
Thanks!
hi
I think the doc type is set always as NB but you can control the number range in:
Production -> Material Requirements Planning -> Plant Parameters - > Carry Out Overall Maintenance of Plant Parameters
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Document type of PR from MRP is controlled by OMDT.
Rajeev
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
you can control via document types allowed categories in customizing by default it will be NB.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
105 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.