Hello Gurus,
I have a strange issue, cost estimate was released for a material with wrong costing variant. Using costing reorganization CKR1 i deleted this standard cost estimate. I checked KEKO and KEPH, no cost estimate exist in that plant for the wrong costing variant.
When i tried to redo the costing run with the correct costing variant, system is not allowing.Its defaulting the old costing variant, no cost estimate being created with the real costing variant
In CK40N for the Marking&Authorization i am seeing an error red mark, instead of the 'LOCK' sign. Any one experienced the same error or any OSS for this
thanks
Nellikka