Skip to Content
author's profile photo Former Member
Former Member

LT0R and LP21

Hi Could anybody plz tell me the diff between LT0R and LP21,how LT0R repelnishment can be done in steps.

Thx

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jun 14, 2007 at 07:02 AM

    Hi Terry

    In LT0R you specify the material you want to replenish.

    In LP 21 you can see the replenishment requirement by storage type and select all replenishment requirements and create TR's direct for all

    I hope that this helps

    Cheers

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 14, 2007 at 01:52 PM

    Terry,

    LTOR is manual replenishment and as said above, it will do it for one material. Here are the pre-requisites and some steps:

    1) Maintain the movement type ( say 999 - warehouse supervision)

    2) In SPRO under log. exec > warehouse mgmt> activities> transfers> Define stock transfer and replenishment control . here you have to define the replenishment strategy ( options are a report, TO for fixed bin and TO random generation) . select the one for your system

    3) Also specify the movement type as the replenishment method for that storage type.

    4) When you run LT0R, now the system will pick up the bin from the WM 2 view and after you execute, it will directly create a TO based on the stock removal strategy defined.

    5) You can see the created TO in LT22 giving the storage type and WH no.

    LP21:

    This is for fixed bin replenishment and again you have to follow steps 1 through 3 mentioned above and on the lp21 screen give a requirement tracking no.

    The mvmt type used is 825 ( generally).

    It will present you the screen from where all and what materials can be staged.

    After hitting material staging and save, go to LB10 and give the tracking no. and then create TO's now from the TR's

    thanks

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hello Abhijit,

      As per your suggestion regarding LP21....

      -


      LP21: This is for fixed bin replenishment and again you have to follow steps 1 through 3 mentioned above and on the lp21 screen give a requirement tracking no.

      The mvmt type used is 825 ( generally).

      It will present you the screen from where all and what materials can be staged.

      After hitting material staging and save, go to LB10 and give the tracking no. and then create TO's now from the TR's

      -


      My question is regarding 'Requirement tracking number' it picks the N and asking requirement number, How system picks this number if I run the batch job 'RLLNACH1'

      and i did not get this 825 movement type...

      Please suggest,

      Regards,

      JPS

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.