Skip to Content
0
Former Member
Jun 12, 2007 at 06:22 AM

an Error with "Message no. KE350", did anybody come across this?

612 Views

Hi every,

When Billing for a delivery (VF01), I found I could not release the billing document to accounting. The error is like following:

"Valuation with material cost estimate: error with product "NIKE"

Message no. KE350

Diagnosis

In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.

In order to determine the current plan period, the system needs to read the valuation segment of the material master.

The system has found that the current plan period is not filled forproduct "NIKE" in plant "BP01".

Display material (View: Costing)

The system looked for the material cost estimate using costing key "YG1", as defined in the Customizing settings for CO-PA.

System response

The document cannot be processed.

Procedure

Contact your system administrator."

Anyone can help me out? Thanks a lot!