Hi,

I want to know how much master data integration is need when using SAP ECC and SAP DP and not using any other components of SAP APO like SNP, PPDS etc.

I know that the master data in DP is all about CVCs, that can be generated from the history loaded in the SAP BW cube. But if I want to transfer the demand (as Planned Independent Requirements) to ECC, what kind of master data integration with SAP ECC has to be done? Should I transfer customer, location master data from ECC to APO?