Skip to Content
author's profile photo
Former Member

Changes in CO-PA DataSource

Dear Experts,

I'm facing the following challenge.

In R/3 (D) there have been some changes in the CO-PA DataSource. Now I've transported the changes to Q, which made the delta stop.

Before I transport the changes to P, I want to know what the best way is to maintain the delta (or set it up, without the need of a reload and the risk of loosing data).

Thanks in advance.

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

1 Answer

  • Best Answer
    author's profile photo
    Former Member
    Posted on Jun 14, 2007 at 06:43 PM

    You could try block postings from R/3. Run the delta update twice for COPA. transport your changes. Make sure the RSA7 for COPA is zero. Delete the delta initialization ( if the changes stop your delta) not needed if the delta is functioning. Then run init without data load. unblock COPA postings. Run periodic delta runs.

    pls assign points to say thanks.

    Add comment
    10|10000 characters needed characters exceeded