Dear All,
I have created dynamic modification rule for skip lot ( T05 for every 5 lots), And set the dynamic modification at the lot level.
1. Created dynamic modification rule, with skip for Every 5 lots.
2. DMR is set at the lot level.
3. DMR is created for lot creation level not for UD
4. While creating a GR, lot created automatically, here my problem is all the 5 lot are open for result recording, I am getting the lot status as "REL CALC SPRQ QLCH" and it is not changing to skip even if i give ud for the lots.
5. Inspection stage change happens correctly after 5 lots to normal inspection in the quality level.
Kindly guide me to solve this problem.
S.Thanigai